# Commercial HVAC work orders for contractors

> Commercial HVAC work orders keep the site, the unit, the PO or NTE note, the checklist, readings and photos on one job, from the call through the invoice.

*Markdown mirror of https://hvacsoftware.com/work-orders/commercial/.*

Commercial HVAC work orders are how a contractor creates, dispatches, tracks and closes a job across many sites and units. The site and the unit sit on the work order, with the PO or the not-to-exceed note, the required checklist steps, the readings and the photos, and the job closes to the invoice.

A rooftop unit at an office park is down in the afternoon. The property manager has a PO and a not-to-exceed note, the last technician who knows the unit is across town, and the office is writing the job in a text thread. The work order is supposed to carry the site, the unit and the limit so the next person does not have to ask.

## What is a commercial HVAC work order?

A commercial HVAC work order is the record of one job at a customer’s site. It names the building, the unit, who is going, and what has to be done before the visit can finish. It is not a ticket in an inbox and it is not a row that only the person who wrote it can find.

Contractors who cover many sites need that record to travel. The property manager, the dispatcher and the technician are rarely in the same place. The job has to say which building, which rooftop unit, and which limit the customer already approved, or the technician arrives and starts the search again.

- **Create:** the call or the request becomes a job, on a site and a unit.
- **Dispatch:** a person places it on the day. The technician sees it on their phone.
- **Track:** checklist steps, readings and photos stay on that visit.
- **Close:** the finished visit is what the invoice is written from.

## What belongs on the work order for one site and one unit?

Write the site and the unit when the job is created. A commercial roof can hold a dozen units, and a job that only names the customer is a job the next technician cannot match to a nameplate. One job holds one unit. A second unit is a second record.

| What you keep | Where it lives | What it is for |
| --- | --- | --- |
| Site | On the job | The building, not a line in a text |
| Unit | On the job, linked to its record | The rooftop unit the visit is for |
| PO | The customer’s number on the job | The invoice can carry the same number |
| Not-to-exceed note | A note on the job | The limit the customer already approved. The note does not approve the spend |
| Checklist | Steps on the visit | What the technician is expected to complete |
| Readings and photos | Entered on the visit | Supply air, amps, the plate photo, written by the person who took them |
| Technician | Assigned on the job | Their jobs and schedule show on their phone |

The PO is the customer’s purchase-order number. The not-to-exceed note is the limit they have already set. A person types both. Nothing reads them off a PDF, and the note does not send an alert by itself. The [unit](https://hvacsoftware.com/assets/) record is where the plate, the model and the earlier jobs live. The work order points at that unit so the visit and the history meet.

## How does a commercial work order move from the call to the invoice?

The path is short, and each step leaves something on the same job. A call that stays in a text thread, and a job that starts blank, are how the PO and the unit get lost before anyone drives out.

1. Take the call or the request. Write the site, the unit and what is wrong.
2. Open the work order against that site and that unit. Add the PO and the not-to-exceed note when you have them.
3. Dispatch it. A person decides the day. The customer gets a text when the job is assigned or moved.
4. The technician opens the job on their phone and completes the checklist, the readings and the photos before leaving the roof.
5. Close the visit. The [invoice](https://hvacsoftware.com/invoicing/) is written from that finished visit, and a person reviews it and sends it.

Preventive maintenance visits are generated from the [service agreement](https://hvacsoftware.com/preventive-maintenance/service-agreements/). Those visits are jobs too. They carry the same site, the same unit and the same place for a checklist. A no-cool call and a planned visit should not live in two different systems.

## What does the technician finish before the visit can close?

The company decides what the visit has to hold. A job type can fill in the checklist. The technician marks the steps, types the readings and adds the photos on the phone. The software does not invent the steps and it does not measure the unit.

- **Checklist:** the steps for this visit, such as filters, supply air and a plate photo. Each one is marked by the person who did it.
- **Readings:** typed on the visit. A supply-air temperature is a number the technician entered, not a feed from the unit.
- **Photos:** the plate, the failed part, the finished work. A photo does not fill the fields. A person still types the model and the serial on the unit.
- **Notes:** what was found and what was left. The next technician opens this visit, not a separate thread.

Photos, notes and a form are among the things a company can require before the visit is finished. Closing the visit does not start the equipment and it does not send the invoice by itself. A person reviews the invoice and sends it. The job’s PO number is there for that invoice to carry.

## Which record should hold a commercial job?

Compare where the site, the unit and the close live. A contractor with many customer buildings needs the job, the unit and the invoice to point at each other. A shared inbox can start the request. It cannot be the place a second technician updates from a roof.

| What the job needs | A shared inbox | A spreadsheet | A work order built for service |
| --- | --- | --- | --- |
| Site and unit on the job | A sentence, if anyone writes it | A cell | Yes. The job names both |
| PO and a not-to-exceed note | In the thread | A cell, if someone maintains it | On the job, typed by a person |
| Required checklist steps | No | A tab the technician does not have | On the visit, on the phone |
| Readings and photos | Attachments, if they survive | A file name | On the visit |
| Close to an invoice | Someone retypes it | A second file | The invoice is written from the finished visit |
| Many customer sites | One thread per building, or one huge thread | One file per customer | Residential and commercial in one system |

## How do you run one building’s work orders this month?

Start with one office park, not the whole book of business. The first month is the open jobs and the units they belong to. A perfect history of ten years is how the project stalls.

1. List the building’s units. One row each: tag, type, where it sits. Create the unit records under that site.
2. Open each current job against the site and the unit. A job with no unit is a job the next technician cannot find from the roof.
3. Type the PO and the not-to-exceed note where you actually have them. An invented limit is worse than an empty note.
4. Put the checklist on the visit. Keep it to steps a technician will mark before leaving.
5. Assign the technician. A person decides the day. The customer gets a text when the job is assigned or moved.
6. On the next visit, write the readings and the photos on the job before the technician leaves the roof. Then close the visit to the invoice.

After that building is dull to run, do the next one. A contractor who finishes one site sees what the technicians will actually type. A contractor who imports every customer on Friday has a pile of jobs with no unit and no note.

## What can a work order not do?

It cannot read a meter, pull a model number out of a photograph, or take a supply-air reading by itself. The technician types the reading. It does not approve the customer’s spend, and a not-to-exceed note does not send an alert or talk to the customer’s purchasing system. It does not forecast a failure from the readings. The readings are a record of what was measured.

It also does not run the unit. People do the work, and a person sends the invoice. A job with a blank unit and a blank note is a title and nothing else, so the value shows up only after the site, the unit and the visit point at each other.

## How does HVAC Software keep the commercial job?

HVAC Software keeps one record from the first call to the paid invoice. The site and the unit sit on that job. Residential and commercial work run in one system, so a house call and an office-park roof share one way of working.

- **Dispatch:** Dragging a job checks skills, drive time and conflicts, and the dispatcher confirms. A person decides the day.
- **The customer knows:** The customer gets a text when a job is assigned or moved, an appointment reminder, an ETA, and a text when the technician is on the way. The dispatcher can see the technician’s live location.
- **On the phone:** The technician’s jobs and schedule show on their phone.
- **PM:** Preventive maintenance visits are generated from the service agreement.
- **Calls:** Call history and the texts from those calls stay with the customer.
- **The invoice:** An open invoice sends a payment reminder. Invoices and payments sync to Sage and NetSuite.

See one commercial job, from the call to the invoice. [Book a demo](https://calendly.com/jeel-fieldcamp/30min?utm_source=hvacsoftware.com&utm_medium=cta&utm_content=work-orders-commercial)

The site, the unit and the close stay on one job in [work orders](https://hvacsoftware.com/work-orders/).

## Questions

### What is a commercial HVAC work order?

It is the record of one job at a customer’s site: the building, the unit, the person assigned, and what the visit has to hold before it can finish. The PO and the not-to-exceed note sit on that job. Checklist steps, readings and photos stay on the visit. The finished visit is what the invoice is written from.

### Where do the site and the unit go?

On the job, when it is created. The job names the site and one unit, and the unit’s page lists the job. A second unit on the same roof is a second record. A job that only names the customer leaves the next technician searching for the nameplate.

### Where do the PO and the not-to-exceed note go?

A person types the customer’s PO number on the job, and the not-to-exceed limit in a note beside it. The invoice can carry that PO number. The note does not approve the spend, it does not send an alert, and it does not talk to the customer’s purchasing system.

### What has to be done before the visit can close?

The company sets that. A job type can fill in the checklist, and the technician marks the steps, types the readings and adds the photos on the phone. Photos, notes and a form are among the things a company can require. The software does not measure the unit and it does not invent the steps.

### Can the technician run the job from a phone?

Yes. The technician’s jobs and schedule show on their phone, including the job for that unit. They complete the checklist, the readings and the photos there. The office still sees the same job. A person decides the day before the technician is sent.

### Does closing the visit create the invoice?

The invoice is written from the finished visit, and it can carry the job’s PO number. A person reviews it and sends it. Closing the visit does not send the invoice by itself, and an open invoice sends a payment reminder. Invoices and payments sync to Sage and NetSuite.

### Can one system hold residential and commercial jobs?

Yes. Residential and commercial work run in one system. A house and an office park each hold their own sites and units, and the jobs use the same record. The technician’s jobs and schedule for both show on their phone. Preventive maintenance visits are generated from the service agreement either way.

## Related guides

- [Technician mobile app](https://hvacsoftware.com/work-orders/technician-mobile-app/)

---

Also here: [Work orders](https://hvacsoftware.com/work-orders/) · [llms.txt](https://hvacsoftware.com/llms.txt)
