# Pharmaceutical maintenance software for the air, water and gas systems behind every batch

> Pharmaceutical maintenance software: work orders, recurring maintenance and readings for cleanroom air handlers, water loops and gas systems. Not validated

*Markdown mirror of https://hvacsoftware.com/manufacturing/pharmaceutical/.*

Before the next batch, quality asks what was done to the air handler. HVACSoftware.com is pharmaceutical maintenance software, a CMMS for the engineering team of a [manufacturing](https://hvacsoftware.com/manufacturing/) plant that makes drugs: [recurring maintenance](https://hvacsoftware.com/preventive-maintenance/) and one record for cleanroom air, purified water, nitrogen and cold rooms. It is not a validated system, and it does not monitor or sign.

[Book an intro meeting](https://calendly.com/jeel-fieldcamp/30min?utm_source=hvacsoftware.com&utm_medium=markdown&utm_content=manufacturing-pharmaceutical): 30 minutes. Bring one air handler suite or one water loop.

## When quality asks and the answer takes until lunch

- The filter changes are in a binder in the interstitial, and the water skid's are on a laptop nobody else opens.
- The validated system holds the filling line, so the air handlers live in a spreadsheet quality has never seen.
- Quality asks what was done to AH-03 before the next batch, and the answer is a hunt through three places.

*Thursday, 4:50 a.m.: Suite 2 reads eight pascals and the AH-03 filter bank is loaded. Quality wants the room back before the next batch.*

## The four systems behind every batch, and what each job holds

21 CFR parts 210 and 211 are FDA's current good manufacturing practice regulations for drugs, and four of their sections reach the building side: [21 CFR 211.46](https://www.ecfr.gov/current/title-21/chapter-I/subchapter-C/part-211/subpart-C/section-211.46) on air, [21 CFR 211.67](https://www.ecfr.gov/current/title-21/chapter-I/subchapter-C/part-211/subpart-D/section-211.67) on maintenance, [21 CFR 211.182](https://www.ecfr.gov/current/title-21/chapter-I/subchapter-C/part-211/subpart-J/section-211.182) on the equipment log and [21 CFR 211.142](https://www.ecfr.gov/current/title-21/chapter-I/subchapter-C/part-211/subpart-H/section-211.142) on storage.

The maker's manual and your plant's own procedure set the intervals and limits. The job holds the record, entered from the [technician's phone](https://hvacsoftware.com/work-orders/technician-mobile-app/).

| System | What the job holds | What stays in your own systems | The rule that names it |
| --- | --- | --- | --- |
| Cleanroom HVAC: air handlers, filter banks, exhaust fans | The unit and the room it serves, the preventive maintenance by calendar date, filter bank differential pressure before and after, parts, who went and when | The room-pressure trend and its alarms, the HEPA integrity test results, the deviation record | [21 CFR 211.46](https://www.ecfr.gov/current/title-21/chapter-I/subchapter-C/part-211/subpart-C/section-211.46), and [EU GMP Annex 1](https://health.ec.europa.eu/system/files/2022-08/20220825_gmp-an1_en_0.pdf) 5.6: planned maintenance, return to use approved |
| Purified water and WFI: distribution pumps, RO skids, storage tanks | The unit and its state, loop temperature and flow, the seal and gaskets replaced | Water quality results, the sanitization record and the monitoring trend | [EU GMP Annex 1](https://health.ec.europa.eu/system/files/2022-08/20220825_gmp-an1_en_0.pdf) 6.7: water systems maintained to prevent contamination, and [21 CFR 211.67](https://www.ecfr.gov/current/title-21/chapter-I/subchapter-C/part-211/subpart-D/section-211.67) |
| Compressed air and nitrogen: generators, dryers, point-of-use filters | The unit, filter differential pressure, the filter changed and the part used | Gas purity and microbial results, the filter integrity test results | [EU GMP Annex 1](https://health.ec.europa.eu/system/files/2022-08/20220825_gmp-an1_en_0.pdf) 6.18 and 6.19: gas quality, and sterilising filters at the point of use |
| Cold rooms: compressors and evaporators behind a warehouse or stability room | The unit and the room it serves, the readings, the repair | The temperature mapping, the monitoring trend and the excursion record | [21 CFR 211.142](https://www.ecfr.gov/current/title-21/chapter-I/subchapter-C/part-211/subpart-H/section-211.142): storage under the right conditions |
| The maintenance entry itself | The date, what was done and who did it, one entry per visit | The signature or initials your procedure asks for, and the batch record | [21 CFR 211.67](https://www.ecfr.gov/current/title-21/chapter-I/subchapter-C/part-211/subpart-D/section-211.67) and [21 CFR 211.182](https://www.ecfr.gov/current/title-21/chapter-I/subchapter-C/part-211/subpart-J/section-211.182): records of maintenance, and the equipment log |

## AI at the engineering desk, before the first shift

AI takes the routine part of the morning, and a person decides. Quality decides what comes back into use.

- **Voice agents** — Answer the [maintenance line](https://hvacsoftware.com/voice-agents/after-hours-calls/) before first shift, take the area, the unit and a [callback number](https://hvacsoftware.com/voice-agents/book-jobs-on-the-call/), and open the job. The agent transfers a live call to a person by the rules you set, or takes the details for a call back. This one is a callback.
- **AI dispatcher** — Proposes [who goes](https://hvacsoftware.com/dispatch/) to AH-03 and when. A person applies it, and nothing is assigned until then.
- **AI scheduling** — Proposes who is free for the pressure check after the repair, with how loaded their day is. A person confirms the slot, and a [skill check](https://hvacsoftware.com/dispatch/skills-based-technician-matching/) when the job is created shows who holds what the job needs, such as a plant gowning qualification.
- **Workflow automation** — [Steps](https://hvacsoftware.com/work-orders/workflows/) run when a job changes status: tell the QA reviewer, tell the engineering manager and tell the Suite 2 lead. You write the rule and see each step it ran. The return to use stays with quality.
- **Chat assistant** — Ask what was done to AH-03 last and read the answer from the records. The assistant reads and lists what is on the record, and a person reads it before it goes to quality.

## What holds the cascade up?

A cleanroom cascade holds because machines hold it. The recommended differential pressure between rooms comes from two documents: FDA's guidance on aseptic processing gives, as an example, a positive differential of at least [10 to 15 Pa](https://www.fda.gov/media/71026/download) between adjacent rooms of different classification, with the doors closed, and EU GMP Annex 1 4.14 gives [a minimum of 10 Pa](https://health.ec.europa.eu/system/files/2022-08/20220825_gmp-an1_en_0.pdf) between rooms of different grades as a guidance value.

The rooms, from the cleanest: Fill suite (ISO 7), Prep corridor (ISO 8), Gowning airlock (ISO 8), Outer corridor (Unclassified).

### Fill suite to prep corridor

| Unit | Its recurring job | What the job holds | Where the rest lives |
| --- | --- | --- | --- |
| AH-03, Supply air handler | Filter bank change and the [quarterly PM](https://hvacsoftware.com/preventive-maintenance/) | Filter bank differential pressure, parts, who went and when | Pressure trend and alarms (monitoring) |
| HF-02, Terminal filter bank | Filter swap, on the maker's schedule | The filters changed, the part used and the photo | HEPA integrity result (quality) |
| EF-02, Exhaust fan | Belt and bearing check | Belt and bearing readings | Fan status (building controls) |
| D-14, Interlocked doors | Interlock and seal check | The check result and the photo | Door-open alarms (monitoring) |
| DPT-21, Differential pressure transmitter | Zero and span check | The check readings | Calibration certificate (metrology) |

### Prep corridor to gowning airlock

| Unit | Its recurring job | What the job holds | Where the rest lives |
| --- | --- | --- | --- |
| RF-04, Return air fan | Belt and bearing check | Belt and bearing readings | Fan status (building controls) |
| HF-05, Terminal filter bank | Filter swap, on the maker's schedule | The filters changed, the part used and the photo | HEPA integrity result (quality) |
| D-16, Interlocked doors | Interlock and seal check | The check result and the photo | Door-open alarms (monitoring) |
| DPT-22, Differential pressure transmitter | Zero and span check | The check readings | Calibration certificate (metrology) |

### Gowning airlock to outer corridor

| Unit | Its recurring job | What the job holds | Where the rest lives |
| --- | --- | --- | --- |
| AH-05, Supply air handler | The quarterly PM | Belts, coils and filter bank readings, parts, who went and when | Pressure trend and alarms (monitoring) |
| D-18, Interlocked doors | Interlock and seal check | The check result and the photo | Door-open alarms (monitoring) |
| DPT-23, Differential pressure transmitter | Zero and span check | The check readings | Calibration certificate (metrology) |

Quality decides when a room is released, and your plant's own procedure sets the limits. HVACSoftware holds the record of the work and does not monitor, alarm or approve.

Bring one suite's equipment list. [Book an intro meeting](https://calendly.com/jeel-fieldcamp/30min?utm_source=hvacsoftware.com&utm_medium=markdown&utm_content=manufacturing-pharmaceutical)

## After the repair, the work is on the record and quality decides

[EU GMP Annex 1](https://health.ec.europa.eu/system/files/2022-08/20220825_gmp-an1_en_0.pdf) 5.6 asks that on completion of maintenance the return to use of air handling systems be approved, and 5.7 that the impact of unplanned maintenance on equipment critical to sterility be assessed and recorded. FDA warning letters have cited [air handler cleaning and maintenance](https://www.fda.gov/inspections-compliance-enforcement-and-criminal-investigations/warning-letters/granules-india-limited-697115-02262025) and [standing water in an HVAC area](https://www.fda.gov/inspections-compliance-enforcement-and-criminal-investigations/warning-letters/reliance-life-sciences-private-limited-730801-08182026). A [rule on job status](https://hvacsoftware.com/work-orders/workflows/) can tell quality the work is done.

Four steps after a repair on an air handler that serves a classified room. The work, with its readings as found and as left, and the return to use requested as a status a person sets, are on the job's record. Quality's review against your procedure and the decision to approve or hold are in your own systems.

## Other sites that keep running

- **Manufacturing** — The chillers, compressed air and plant HVAC behind every production line.
- **Food and beverage** — Refrigeration, cold rooms and the record an auditor asks for.
- **Hospitals** — Rooms that must hold pressure, and the rounds that keep them there.

## Questions drug plant teams ask

### Is this a validated system, and does it support 21 CFR Part 11?

No, HVACSoftware is not a validated system and makes no [21 CFR Part 11](https://www.ecfr.gov/current/title-21/part-11) or electronic-signature claim. Part 11 applies to records kept in electronic form under FDA's rules, so whether it reaches a maintenance record is your quality unit's call. The job record holds the work: the unit, the readings as found and as left, the parts, the photo, and who went and when. The GMP record, monitoring trends, calibration certificates and quality decisions stay in your plant's own controlled systems.

### What does a maintenance record for an air handler or a water pump hold?

The job holds the unit, the room it serves, the readings before and after the work, the parts used, the photo, and who went and when.

### Which maintenance records do 21 CFR 211.67 and 211.182 call for?

[21 CFR 211.67](https://www.ecfr.gov/current/title-21/chapter-I/subchapter-C/part-211/subpart-D/section-211.67) calls for written maintenance and cleaning procedures and for records of maintenance, cleaning, sanitizing and inspection. [21 CFR 211.182](https://www.ecfr.gov/current/title-21/chapter-I/subchapter-C/part-211/subpart-J/section-211.182) adds an equipment log, which the persons who perform and double-check the work date and sign or initial. HVACSoftware holds the maintenance entry with its date and who did the work, and it has no electronic signatures, so whether it can serve as that log is for your quality unit.

### What are the HVAC guidelines for the pharmaceutical industry?

In the US, [21 CFR 211.46](https://www.ecfr.gov/current/title-21/chapter-I/subchapter-C/part-211/subpart-C/section-211.46) requires adequate ventilation, with control over air pressure, micro-organisms, dust, humidity and temperature where appropriate. [EU GMP Annex 1](https://health.ec.europa.eu/system/files/2022-08/20220825_gmp-an1_en_0.pdf) 5.6 adds that air handling systems, including filtration, are under planned maintenance and that their return to use is approved. The maker's manual and your plant's procedure set the intervals, and the job holds what was done.

### Who decides that an air handler can go back into use after a repair?

Your quality unit decides, as EU GMP Annex 1 5.6 asks that the return to use of air handling systems be approved after maintenance. Annex 1 5.7 asks that the impact of unplanned maintenance on equipment critical to sterility be assessed and recorded. The job holds the work and the readings, and the return to use is a status a person sets: HVACSoftware does not block a room or a batch.

### Does it monitor room pressure, manage calibration or raise alarms?

No, HVACSoftware does not monitor room pressure, manage calibration or raise alarms, and it is not calibration management software. A person enters the readings as found and as left. The continuous trend and its alarms stay in your monitoring system, and the transmitter's certificate stays in your calibration program. A recurring job can still put the transmitter check on the calendar.

### How does a CMMS for pharmaceutical plants sit beside the validated CMMS we already run?

Beside it, for the building and utility work, if your quality unit says so, or not at all. A plant can keep a validated system for production equipment and a plainer record for air handlers, water loops and gas systems. HVACSoftware is that plainer record, pharma maintenance software for the building side only, with your validated system, quality system and monitoring left as they are. A small biotech, a lab or a contract site fits the same way, since plant type is a field on the record.

### Where do we start: one air handler suite or the whole site?

Start with one suite or one water loop. List its air handler, filter banks, exhaust fans and transmitters, or its pumps, skid and tank, and each becomes a unit with a [recurring job](https://hvacsoftware.com/preventive-maintenance/recurring-visits/) on its own calendar date. Recurring work runs on dates, not on run hours or sensors. The intro meeting is 30 minutes, and you bring one suite's equipment list.

Still have a question? [Book an intro meeting](https://calendly.com/jeel-fieldcamp/30min?utm_source=hvacsoftware.com&utm_medium=markdown&utm_content=manufacturing-pharmaceutical)

## Show us the air handler quality asks about

30 minutes about one suite or one water loop and how your team works today.

[Book an intro meeting](https://calendly.com/jeel-fieldcamp/30min?utm_source=hvacsoftware.com&utm_medium=markdown&utm_content=manufacturing-pharmaceutical)

---

Also here: [llms.txt](https://hvacsoftware.com/llms.txt)