# Hospital maintenance software for rooms that must hold pressure

> CMMS for hospitals: work orders, PM, rounds, generator tests and ICRA permits for air handlers and pressure rooms. Facilities only, no medical devices.

*Markdown mirror of https://hvacsoftware.com/hospital/ — Industries / Hospitals.*

HVACSoftware.com is hospital maintenance software, a CMMS for US hospital facilities teams. Work orders, preventive maintenance, rounds, generator tests and ICRA permits for air handlers, operating rooms and the plant behind them sit on one record per unit. Biomedical equipment is out of scope.

[Book an intro meeting](https://calendly.com/jeel-fieldcamp/30min?utm_source=hvacsoftware.com&utm_medium=markdown&utm_content=hospital): 30 minutes about your sites and equipment.

## A night in the plant room

A pressure alarm at 02:10 in OR 6. The job opens with the room, the air handler that serves it and the people to tell, and the technician logs the readings as found and as left.

- **02:10** — The job opens. Pressure alarm response, high priority, source call, scheduled 02:10 to 03:25 for OR 6.
- **Before work** — The unit is told. The record names who was notified: the perioperative charge nurse.
- **As found** — Two readings outside limit. OR 6 reads −0.004 in. wc and AHU-04 moves 2,610 CFM.
- **As left** — Two readings within limit. OR 6 reads +0.019 in. wc and AHU-04 moves 3,120 CFM, with the belt and filter record attached.

## Rooms that must hold pressure

An operating room stays positive to every space around it. An airborne isolation room stays negative. A protective environment room stays positive. The air handler behind each room is what holds that, so the record that matters is the room and the unit that serves it.

Each air handler is stored with its state and the rooms it serves, and each reading as your technician enters it, as found and as left.

| Room type | Pressure relationship | Air changes per hour | Source |
| --- | --- | --- | --- |
| Operating room | Positive to all adjoining spaces at all times; a differential of at least +0.01 in. wc (2.5 Pa) | At least 20 (occupied); ASHE notes a typical operating room delivers 4 of them as outdoor air | [ASHE, Evaluate and implement operating room airflow setback (PDF)](https://www.ashe.org/system/files/media/file/2022/04/12-Evaluate-and-Implement-OR-Airflow-Setback.pdf) |
| Airborne infection isolation room | Negative to adjacent spaces; all supply air exhausted outdoors | 12 | [ASHE, Infection Control Guide on HVAC for Nurse Managers and Clinicians (PDF)](https://www.ashe.org/system/files/media/file/2022/04/02-Nurse-Manager-Clinicians-Guide_FINAL.pdf) |
| Protective environment room | Positive to adjacent spaces; no outdoor exhaust needed | 12 | [ASHE, Infection Control Guide on HVAC for Nurse Managers and Clinicians (PDF)](https://www.ashe.org/system/files/media/file/2022/04/02-Nurse-Manager-Clinicians-Guide_FINAL.pdf) |

## Which permit does this ceiling job need?

Pick the work and the area. The check shows the class of precautions from ASHE's ICRA 2.0 matrix, and whether the matrix calls for a permit. If the work reaches more than one risk group, ASHE says to pick the higher one. Your hospital's infection control team decides, and its policy comes first.

| Risk group | Type A | Type B | Type C | Type D |
| --- | --- | --- | --- | --- |
| Low | Class I | Class II | Class II | Class III |
| Medium | Class I | Class II | Class III | Class IV |
| High | Class I | Class III | Class IV | Class V |
| Highest | Class III | Class IV | Class V | Class V |

- Activity types: Type A: inspection, non-invasive (for example, one ceiling tile out to look); Type B: small-scale, short duration (for example, work above the ceiling, fan shutdown or startup); Type C: large-scale, longer duration (for example, invasive electrical work above ceilings, or more than one shift); Type D: major demolition and construction (for example, removing or replacing a building system component).

- Patient risk groups: Low risk: non-patient areas (for example, public hallways, offices, mechanical rooms not on clinical units); Medium risk: patient care support areas (for example, waiting areas, clinical engineering, sterile processing dirty side); High risk: patient care areas (for example, patient rooms, the emergency department, laboratory); Highest risk: procedural, invasive, sterile or highly compromised care (for example, OR theaters, ICU, oncology, sterile processing clean side).

ASHE: "Infection control permit and approval will be required when Class of Precautions III (Type C) and all Class of Precautions IV or V are necessary."

* ASHE adds: a Class III work area that cannot be sealed and completely isolated from occupied patient care spaces should be raised to include the negative air exhaust requirements of Class IV.

ASHE: "Sewage, mold, asbestos, gray water and black water will require Class IV for LOW and MEDIUM and Class V for HIGH and HIGHEST."

If the work involves sewage, mold, asbestos, gray water or black water, ASHE raises the class to IV in low and medium risk areas and to V in high and highest risk areas, and Class IV and V call for a permit.

- **Class I** — Do the non-invasive work without blocking or interrupting patient care, and without making dust. Put any displaced ceiling tile back right away.
- **Class II** — Limited dust work only, following the standing precautions your organization has approved. ASHE adds that this class must never be used for construction or renovation.
- **Class III** — Actively keep dust from reaching occupied areas, with a HEPA vacuum, plastic containment or a closed door. Isolate the return and supply diffusers; a contained area stays neutral or negative. Seal doors, contain and carry out trash in lidded containers.
- **Class IV** — Critical barriers that meet NFPA 241 and run to the ceiling or, with a tile out, to the deck above. Negative pressure in the whole work area with HEPA exhaust, and a device outside the work area that monitors it. Shoe covers, clean clothing, and an adhesive mat at the entrance.
- **Class V** — Critical barriers that meet NFPA 241, plus an anteroom large enough for equipment and carts. Disposable coveralls at all times in the work area, removed in the anteroom. Negative pressure in the whole work area with HEPA exhaust, and a device outside the work area that monitors it.

After the work, ASHE's Table 6 asks the team to verify that the HVAC systems meet their original airflow and air exchange design specifications. The as-left readings on the work order are where that goes.

Your infection control team decides. This check shows ASHE's matrix; it does not approve work.

Matrix and wording from [ASHE ICRA 2.0](https://www.ashe.org/icra2), ASHE ICRA 2.0 Matrix of Precautions for Construction, Renovation and Operations, Tables 1 to 3 and 5. © 2022 American Society for Health Care Engineering (ASHE) of the American Hospital Association. [ASHE ICRA 2.0 Matrix of Precautions (PDF)](https://www.ashe.org/system/files/media/file/2023/01/ASHE_ICRA_2_TM_form_0.pdf) and [ASHE ICRA 2.0 permit form (PDF)](https://www.ashe.org/system/files/media/file/2023/01/ASHE_ICRA_2_TM_permit.pdf).

### On the work order

The permit sits on the job as its own tab: number, activity type, risk group, precautions and status, with the signed PDF attached.

## Rounds and tests, in your words

Recurring work sits on the calendar and keeps the same record every time. [Preventive maintenance](https://hvacsoftware.com/preventive-maintenance/) here is calendar based.

- **Air handler PM** — One job for the OR suite, one visit
- **Generator monthly load test** — One log for each monthly run

- **Plant round** — Mechanical rooms, pressure indicators and photos on one checklist, signed at the end, so the next shift reads what the last one saw.

## Your technicians work it from their phone

The technician opens the job, follows the checklist, enters the reading and adds the photo. The same job record the office sees is the one in their hand.

1. Open the job and read the room, the unit and who was notified.
2. Follow the checklist and enter each reading as found.
3. Make the repair, then enter the readings as left.
4. Add the photo and the belt and filter record.

## AI for the work around the pressure alarm

A pressure alarm at 02:10 does not wait for the office to open. AI takes the routine part of the night, and a person still decides.

- **AI scheduling** — Proposes technicians who are free and hold the certification the visit needs. A person confirms the slot.
- **AI dispatcher** — Proposes who, when and which job for a pressure alarm. A person applies it.
- **Voice agents** — Answer a pressure alarm call at night, take the room, the unit and a callback number, and open the job for dispatch.
- **Workflow automation** — Steps run when a job changes status.
- **Chat assistant** — Ask which ICRA permits are open or which one is still waiting for approval, and read the answer from the record.

## The record the surveyor asks for

One unit's history, one room's readings, the permits and the signatures sit in one place, in the order they happened.

- **One unit's history** — Every job, reading and document for GEN-1 or AHU-04, newest first.
- **One room's readings** — Each reading for OR 6, as found and as left, with the result in words.
- **Permits and signatures** — The ICRA permit on the job, its status, and who signed.

The Joint Commission restructured its hospital standards: the Environment of Care and Life Safety chapters are now one Physical Environment chapter. Source: [ASHE, Joint Commission standards receive significant updates](https://www.ashe.org/joint-commission-standards-receive-significant-updates).

## Questions hospital facilities teams ask

### What should a hospital record when an operating room loses its pressure relationship?

Record the room, the air handler that serves it, the readings as found and as left, who was told and who fixed it. A job holds those as fields, with the limits your team enters and the files attached. ASHE quotes ANSI/ASHRAE/ASHE 170 as keeping operating rooms positive to all adjoining spaces at all times, so the as-left reading is the proof the room is back.

### When does work above a ceiling need an ICRA permit?

ASHE's ICRA 2.0 matrix calls for an infection control permit and approval on every Class IV or V job and on Class III for Type C work. Lifting one ceiling tile to look is Type A. Most other work above a ceiling is Type B, which reaches a permit only in the highest-risk areas. New cable pathways or invasive electrical work above a ceiling are Type C, which needs a permit in every area except low risk. Your infection control team classifies the job, and the [permit check](https://hvacsoftware.com/hospital/#icra-check) above shows the matrix result for each pairing.

### What changed in the Joint Commission hospital standards?

The Joint Commission restructured its hospital standards, and the Environment of Care and Life Safety chapters became one Physical Environment chapter. ASHE reports that the Joint Commission will not cite hospitals for references to the old standards while the requirement is still being met. This page uses plain-word names for programs, not standard numbers.

### Can an operating room run fewer air changes while it is empty?

Yes, ANSI/ASHRAE/ASHE 170 lets a room run fewer air changes while unoccupied, provided the required pressure relationship holds and the minimum air changes return whenever the room is occupied. ASHE quotes this from the 2013 edition. The pressure reading is the one to keep on the record, whatever rate your team sets.

### How is the monthly generator test recorded?

Record it as a job with the run duration, the load as a share of nameplate, the transfer switch result, the fuel level, who ran it and when. The monthly load test log has those fields, with readings as found and as left. The limits come from NFPA 110 and the edition your authority adopted.

### How do you keep a record per room and per air handler without a paper binder?

Each air handler is an asset with a state, such as In service, Degraded, Out of service or Returned to service, and the rooms it serves. Each job, reading, document and permit attaches to that unit, so one unit's history opens as a list, newest first.

### Can this replace our current hospital CMMS, and what moves across?

The answer depends on what your current healthcare CMMS holds: units, preventive maintenance schedules, open work and history. The intro meeting is where we go through yours and say what fits today and what does not.

### Does HVACSoftware cover medical equipment, or facilities only?

Facilities only: HVACSoftware covers air handlers, operating-room and isolation-room pressure, generators, life safety and ICRA permits. Biomedical equipment, such as device calibration and recalls, is out of scope.

Running halls that cannot go dark? Read about [data center maintenance software](https://hvacsoftware.com/data-center/).

Still have a question? [Book an intro meeting](https://calendly.com/jeel-fieldcamp/30min?utm_source=hvacsoftware.com&utm_medium=markdown&utm_content=hospital)

## Walk us through your plant

30 minutes about your rooms, your plant and how your team works today.

[Book an intro meeting](https://calendly.com/jeel-fieldcamp/30min?utm_source=hvacsoftware.com&utm_medium=markdown&utm_content=hospital)

---

Also here: [llms.txt](https://hvacsoftware.com/llms.txt)
