# School maintenance software for one summer and every building

> CMMS for school districts and campuses: work orders, summer-break service, unit ventilators, boilers and rooftop units on one record for every building.

*Markdown mirror of https://hvacsoftware.com/education/ — Industries / Education.*

The front office phoned at 7:05 a.m.: Room 208 was hot again, and nobody could say which unit serves it. HVACSoftware.com is school maintenance software, a CMMS for districts and campuses: requests, work orders, [recurring maintenance](https://hvacsoftware.com/preventive-maintenance/), equipment and parts on one record per unit.

[Book an intro meeting](https://calendly.com/jeel-fieldcamp/30min?utm_source=hvacsoftware.com&utm_medium=markdown&utm_content=education): 30 minutes. Bring your building list and your summer work.

## When the summer runs out before the list does

- A teacher says the room is hot, and by the time it is a work order nobody knows which unit serves it.
- The summer gets shorter every year and the list does not: every unit in every building before the first day of school.
- A boiler start-up that slid past August becomes a cold morning with the whole school in the building.

## Tuesday, 7:05 a.m.: Room 208 is hot

One call, one unit, one person who decides who goes. The line is [answered before the office opens](https://hvacsoftware.com/voice-agents/after-hours-calls/), and the job opens with the unit on it.

- **7:05 a.m.** — The call is answered. The front office reports Room 208 at 79 °F. The voice agent takes the room, the unit and a callback number, then opens a high priority job for dispatch.
- **At once** — The job opens on the unit. UV-208 serves Room 208 in the east wing. Its jobs, readings and parts are already on the record.
- **Before the visit** — A person confirms who goes. The dispatcher proposes D. Whitlock, free from 9:40 and booked on one other visit that day, and the head of maintenance applies the suggestion.
- **9:40 a.m.** — The readings are entered. Room temperature 79 °F as found and 73.2 °F as left, supply air 66.8 °F and 56.9 °F, and the valve actuator record attached.
- **10:40 a.m.** — The unit returns to service. UV-208 is marked Returned to service, and the next request for Room 208 starts with all of this.

## The building is full all year. The work fits in the gaps.

Districts carry a long list. The average main instructional building is [49 years old](https://nces.ed.gov/fastfacts/display.asp?id=94), and [GAO estimated that 41 percent of districts](https://www.gao.gov/products/gao-20-494) need to update or replace HVAC systems in at least half of their schools. The windows to do it in are the same size either way. Summer break takes the large jobs, and winter and spring break take the short ones.

The school year as a strip: the fall and spring terms are full, and the work sits under the breaks. Summer break takes the large jobs, winter break takes boiler checks and filter rounds, spring break takes short jobs and recheck visits.

## Will your summer hold?

Type your list and your crew to see the hours the work needs against the hours your technicians have in the break.

[Technician capacity planning](https://hvacsoftware.com/scheduling/technician-capacity-planning/) shows booked hours per technician.

| What | How it is worked out |
| --- | --- |
| Hours the work needs | Units to service times the hours one unit takes |
| Hours the crew has in the break | Technicians times weeks times hours a week, less the share emergencies and absence take |
| The gap | Hours the work needs less hours the crew has |
| Technicians the gap equals | Hours short divided by the hours one technician has in the break |

The check is arithmetic on your numbers, not a forecast: a cold snap, a failed boiler or a retirement moves the real hours.

Bring the sentence and your building list. [Book an intro meeting](https://calendly.com/jeel-fieldcamp/30min?utm_source=hvacsoftware.com&utm_medium=markdown&utm_content=education)

## What AI did with the 7:05 call

Five moments of the same Tuesday, in the order they happened. AI does the routine part, and a person still decides.

- 7:05 Voice agent
- 7:09 Dispatcher
- 10:44 Workflow
- Thursday Scheduling
- Next request Chat

*On a campus the record is the same: a residence hall, a lab, a shop that serves the whole quad.*

## Room 208, closed from the classroom

1. Open the [job record](https://hvacsoftware.com/work-orders/) and see UV-208 under the window in Room 208.
2. Enter 79 °F as found and 73.2 °F as left.
3. Photograph the valve actuator and close 6208.

## Questions school maintenance teams ask

### When should school HVAC preventive maintenance be scheduled around summer break?

Put the large jobs in summer break and the short ones in winter and spring break, when the rooms are empty. [EPA's preventive maintenance guidance for schools](https://www.epa.gov/iaq-schools/indoor-air-quality-tools-schools-preventive-maintenance-guidance-documents) is voluntary: it starts with an equipment inventory, then checklists and a schedule, and asks for a facility walkthrough at least once a year. Your state and district decide what applies, and recurring work in HVACSoftware.com runs by [calendar date](https://hvacsoftware.com/preventive-maintenance/recurring-visits/), so each visit lands on the break you set.

### What happens to a teacher's maintenance request after it is submitted?

The request becomes a job on the unit that serves the room, and a person applies who goes and when. Requests reach the maintenance office by phone, where the voice agent opens the job, or through the [booking page](https://hvacsoftware.com/scheduling/online-booking/). The technician's readings and the unit's state go on the same record, so the next request for that room starts with its history.

### How do you avoid sending a technician to a room that is warm for a simple reason?

Read the unit's record and ask what the room is set to before anyone drives to the school. A room that is warm because of a schedule or an override needs a changed setting, not a repair, and the record keeps that answer for the next request. The unit's state, its last job and its readings are on the one record.

### How many technicians does a district need for its preventive maintenance?

The number is the hours the work needs divided by the hours one technician has in the break window. Type your units, the hours one takes, your crew and your weeks into the check above and it works out the gap in hours and in technicians. How booked hours sit against each technician's day is on the [capacity page for technicians](https://hvacsoftware.com/scheduling/technician-capacity-planning/), once the work is scheduled.

### Can software replace our current school work-order system, and what moves across?

A school or district can run its requests, work orders and recurring maintenance in HVACSoftware.com instead of its current system. What moves across, and how, is worked out on the intro meeting from your building list and your open work.

### Does it work for both a K-12 district and a university campus?

Yes, a district's schools and a campus's halls, labs and shops are each a site with their own units, rooms and jobs. A residence hall turnover check and a rooftop unit's seasonal service are the same kind of record, and [dispatch across many sites](https://hvacsoftware.com/dispatch/multi-location/) shows who is free at each. Offices and other buildings are on the [facility maintenance software](https://hvacsoftware.com/facilities/) page.

### Who gets called when a boiler fails at 4 a.m. in January?

The after-hours line is answered by a voice agent, which logs the call and opens the job for dispatch. A person confirms who goes, and the boiler's readings as found and as left go on its record. By the rules you set, the agent can transfer a live call to a person; here the callback is the hand-off, as described in [after-hours calls](https://hvacsoftware.com/voice-agents/after-hours-calls/).

### What is a deferred maintenance backlog, and how does a record help a capital request?

A deferred maintenance backlog is the list of repairs and replacements a school or campus has put off for lack of money or time. A unit's record shows every visit, reading and part, so a request to replace it can show repeat history instead of a story. [GAO's review of school districts' building systems](https://www.gao.gov/products/gao-20-494) is the public picture of how many districts have systems to update or replace.

Still have a question? [Book an intro meeting](https://calendly.com/jeel-fieldcamp/30min?utm_source=hvacsoftware.com&utm_medium=markdown&utm_content=education)

## Bring your summer list

30 minutes about your buildings, your crew and the work you cannot fit in the break.

[Book an intro meeting](https://calendly.com/jeel-fieldcamp/30min?utm_source=hvacsoftware.com&utm_medium=markdown&utm_content=education)

---

Also here: [llms.txt](https://hvacsoftware.com/llms.txt)
