# Data center cooling maintenance records for audit

> Keep data center cooling maintenance records audit-ready: unit, visit, technician, readings, refrigerant service, and close-out on one record.

*Markdown mirror of https://hvacsoftware.com/data-center/maintenance-records/.*

An audit-ready cooling maintenance record is one visit tied to one unit. It names the CRAC, CRAH or chiller, the site, the date, the technician, the readings, and any refrigerant added on that visit. The close-out stays on the same job, so an owner or auditor can see what was done, by whom, and what was recorded.

J. Park is on CRAH-04 in Hall B. Oct 14 was a PM visit, Sep 9 was a filter change, and Aug 12 was a refrigerant check. Those three visits belong on the unit, where the next person can open them.

## What makes a cooling maintenance record audit-ready?

A cooling maintenance record is audit-ready when it is complete and a person can find that visit later. It names the unit and the site, the work, the person, the date, the readings or refrigerant quantities that belong on that visit, and how the visit was closed.

| What the record holds | What an owner can see |
| --- | --- |
| Unit and site | Which CRAC, CRAH or chiller, and which hall |
| Date and type of service | What the visit was, and when |
| Technician | Who did the work |
| Readings or findings | What was measured or seen on that visit |
| Refrigerant added, or a leak inspection | Only when that work happened |
| Close-out | The visit ended on the same job |

Facility programs describe what that packet has to satisfy. [ANSI/ASHRAE/ACCA Standard 180-2018](https://www.ashrae.org/technical-resources/bookstore/ansi-ashrae-acca-standard-180-2018) says a maintenance program includes an equipment inventory and a plan, and that execution of a task is documented and archived, whether the authorization was written or verbal. [Uptime Institute's Management and Operations criteria](https://uptimeinstitute.com/professional-services/management-operations/mando-criteria) describe a preventive-maintenance program, fully scripted procedures, and a maintenance management system that tracks equipment status and maintenance activity.

Those lines are the owner's expectations of the facility program. The contractor's packet has to be complete enough that the owner can keep it with the unit. Tracking deferred work and outages belongs to that facility program.

## What should each visit record include?

Each visit record is the work of that day on that unit, written so a person who was not there can read it. For CRAH-04 in Hall B, the Oct 14 line is a PM visit by J. Park, and the earlier lines are the Sep 9 filter change and the Aug 12 refrigerant check.

| On the visit | What to write | What to leave off |
| --- | --- | --- |
| Unit and location | CRAH-04, Hall B | A second unit this visit is not for |
| Date and type of service | Oct 14, PM visit | A visit that has not happened |
| Technician | J. Park | A name that was not on the job |
| Tasks | The checklist items actually done | A step nobody performed |
| Readings and findings | What was measured or seen | A number you did not take |
| Refrigerant | Quantity added, or the leak inspection and the repair check, when that was the work | A refrigerant line on a filter change |
| Close-out | The visit ended on this job | A note that lives only in a truck folder |

Write the readings and the findings that belong to that visit. When the work added refrigerant, or included a leak inspection or a test that verified a repair, those notes sit on the same job, with the quantity added. A [maintenance checklist](https://hvacsoftware.com/preventive-maintenance/maintenance-checklist-software/) names the tasks for a planned visit, and the record is what remains after the visit, on the unit.

## How do EPA Section 608 records fit a contractor visit?

[EPA Section 608 recordkeeping](https://www.epa.gov/section608/recordkeeping-and-reporting-requirements-stationary-refrigeration) sits in 40 CFR Part 82, Subpart F. Some owner and technician duties on that page are written for appliances with 50 or more pounds of ozone-depleting refrigerant. A technician who services such an appliance must give the owner an invoice that shows the amount of refrigerant added, and must provide the owner with records of leak inspections and repair-verification tests (40 CFR 82.157(l)(3)).

The owner or operator of that appliance must keep servicing records with the date and type of service and the quantity of refrigerant added, and must also keep the leak-inspection and repair-verification records the technician provided. The contractor's invoice and the visit record are how the owner receives the quantity added and those notes.

| Who | What that EPA page says they keep |
| --- | --- |
| Technician | Provide the owner an invoice showing the refrigerant added, and records of leak inspections and repair-verification tests (40 CFR 82.157(l)(3)) |
| Owner or operator | Date and type of service, quantity of refrigerant added, and the leak-inspection and repair-verification records |
| Report | Due March 1 if such an appliance leaked 125 percent or more of its full charge in the prior calendar year |

The page states that March 1 report and that 125 percent threshold for those appliances. The visit record carries the quantity and the inspection notes when that work happened. It does not add an interval, a leak rate or a retention period.

## How should records sit on the unit, not in a truck folder?

The visit belongs on the unit, not in a folder that left on the truck. [Asset records](https://hvacsoftware.com/assets/equipment-records/) keep one history per unit, and the jobs written against it. CRAH-04 in Hall B holds the Oct 14 PM visit, the Sep 9 filter change and the Aug 12 refrigerant check.

- **One unit.** CRAH-04 in Hall B is the record the visits sit on.
- **One visit.** The Oct 14 PM visit is a job, linked to the work order.
- **One history.** The filter change and the refrigerant check stay with that unit.
- **One close-out.** The job holds the readings and the end of the visit.

A PM visit generated from a [service agreement](https://hvacsoftware.com/preventive-maintenance/service-agreements/) is still a job on that unit. A [commercial work order](https://hvacsoftware.com/work-orders/commercial/) keeps the site, the unit and the close-out together. The history stays in one place, from the first call to the paid invoice.

## How does HVAC Software help a contractor keep cooling maintenance records?

Residential and commercial work run in one system. The visit, the work order and the invoice sit on one record from the first call to the paid invoice. PM visits come from the service agreement, and the technician's jobs and schedule show on their phone.

- **The record.** One record from the first call to the paid invoice, for a house or a commercial building.
- **The agreement.** PM visits come from the service agreement and stay on the unit.
- **The phone.** The technician's jobs and schedule show on their phone.
- **The system.** Residential and commercial work run in one system.

See the visits on the unit they belong to. [Book a demo](https://calendly.com/jeel-fieldcamp/30min?utm_source=hvacsoftware.com&utm_medium=cta&utm_content=data-center-maintenance-records) and walk a cooling visit from the job to the invoice.

The visit stays on the unit in [data center maintenance](https://hvacsoftware.com/data-center/).

## Questions

### What belongs in data center cooling maintenance records for an audit?

The record names the unit, the visit, who did the work, the date and the type of service, the readings or findings, and the close-out. Refrigerant quantities and leak-inspection or repair-verification notes belong on the visit when that work happened. Keep them with the unit, so they can be given to the owner.

### What refrigerant records does EPA Section 608 ask technicians and owners to keep?

For appliances with 50 or more pounds of ozone-depleting refrigerant, a technician must give the owner an invoice showing the amount of refrigerant added, and must provide the owner with records of leak inspections and repair-verification tests (40 CFR 82.157(l)(3)). The owner or operator must keep servicing records with the date and type of service and the quantity of refrigerant added, plus those leak-inspection and repair-verification records. A report to EPA is due March 1 if such an appliance leaked 125 percent or more of its full charge in the prior calendar year.

### What does ASHRAE 180 expect a maintenance program to document?

ANSI/ASHRAE/ACCA Standard 180-2018 describes an equipment inventory with manufacturer information, location, capacity and an identifier, and a maintenance plan that names each task, its frequency, who performs it, who authorizes it, and how completion is documented. Execution of a task is documented and archived, whether the authorization was written or verbal.

### Do these records replace the facility's own maintenance management system?

No. The contractor's job record is what the HVAC company hands the site. Uptime Institute's Management and Operations criteria describe a facility maintenance program and a system that tracks preventive-maintenance status. That program belongs to the operator.

### How does a service contractor attach each visit to the right CRAC, CRAH or chiller?

Create the job against the unit on the site. The unit page lists the jobs, and the job holds the readings and the close-out. CRAH-04 in Hall B is one unit, and the Oct 14 PM visit is one job on it.