# Airport facility maintenance software for the hour before the first bank

> Airport facility maintenance software for terminal teams: air handlers, central plant, jet bridge PCA units and ground power on one record per unit.

*Markdown mirror of https://hvacsoftware.com/airports/.*

At 4:50 a.m. the PCA unit at gate B14 faults with an aircraft on stand, and nobody can say whose unit it is or who last worked on it. HVACSoftware.com is airport facility maintenance software, a CMMS for terminals and gate units: work orders, [recurring maintenance](https://hvacsoftware.com/preventive-maintenance/recurring-visits/) and parts on one record per unit. It is not airfield or aircraft software.

[Book an intro meeting](https://calendly.com/jeel-fieldcamp/30min?utm_source=hvacsoftware.com&utm_medium=markdown&utm_content=airports): 30 minutes. Bring your gate and plant list.

## One gate. One concourse. One plant.

- The gate unit is down with an aircraft already on stand and its auxiliary power running, and the answer to whose unit it is sits on a log sheet in a drawer.
- By 5:30 the Concourse B holdrooms are warm, the station manager is ringing the duty manager, and nobody can say when the air handler was last serviced.
- Behind both is the central plant: one chiller down and every gate leans on the other, and the last contractor's report is in somebody's email.

## One gate, three units, three possible owners

A PCA unit sends conditioned air into the cabin, so the aircraft's auxiliary power unit is used less, and [point-of-use units on the bridge or the apron](https://www.iata.org/contentassets/d1d4d535bf1c4ba695f43e9beff8294f/pre-conditioned-air---airport-infrastructure-requirements.pdf) mean more maintenance, since each has its own chiller.

One gate and the units behind it: the central plant's chillers make chilled water for the concourse's air handlers, which condition the holdrooms. At gate B14 a jet bridge runs to the aircraft, and three units hang under it: the bridge's own HVAC unit, which conditions the walkway, the PCA unit, which sends cabin air through a hose, and ground power, which feeds the aircraft. Each of the three can have its own owner and its own maintainer.

| The HVAC unit on a jet bridge | A PCA unit |
| --- | --- |
| Conditions the covered walkway where passengers board | Sends conditioned air into the aircraft cabin through a hose |
| Both: Each is an asset on gate B14's record, with its own owner, maintainer and visits. |  |

## Airport terminal maintenance software, from the plant to the gate unit

Airport maintenance software for the terminal is one record for each unit, from a plant chiller to a gate's PCA unit. It leaves out runways, airfield lighting and aircraft.

- **Work orders** — Open a job on the unit and run it through its visits.
- **Preventive maintenance** — [Recurring visits](https://hvacsoftware.com/preventive-maintenance/recurring-visits/) on every PCA unit, air handler and chiller, set by calendar date.
- **Inspections** — Rounds as checklists with photos and readings.
- **Assets** — Every unit with its gate, owner and maintainer.
- **Inventory** — Filters, hoses and belts by store room.
- **Scheduling** — Place each visit with a technician who is free.
- **Dispatch** — A [skill check](https://hvacsoftware.com/dispatch/skills-based-technician-matching/) when the job is created shows which technicians fit a PCA or an electrical job.
- **Contractors** — An outside contractor named on the job beside your crew, report attached.

## Whose unit is it?

Pick the units you run, then who owns each. The table shows who maintains it and what the [job a technician fills in](https://hvacsoftware.com/work-orders/) carries.

In [one city's published audit of its boarding bridges](https://www.shreveportla.gov/ArchiveCenter/ViewFile/Item/2670), maintenance sat with the airline or the airport by use and lease agreement, and of 34 work orders and log sheets reviewed, 12 work orders were signed off by the person who did the work and 9 log sheets were not signed off.

| Unit | What it does | Owner today | Who maintains it | What the job carries |
| --- | --- | --- | --- | --- |
| A PCA unit on a jet bridge | Cabin air, through a hose | Pick who owns it | Your use agreement decides | Gate, unit, readings as found and left |
| Gate ground power | Power to the parked aircraft | Pick who owns it | Your use agreement decides | Gate, unit, electrical check found and left |
| The HVAC unit on a jet bridge | Conditions the walkway | Pick who owns it | Your use agreement decides | Gate, unit, walkway temperature found and left |
| A terminal air handler | Conditions the holdrooms | Pick who owns it | Your use agreement decides | Concourse, unit, filters and belts, photos |
| A central plant chiller | Makes the chilled water | Pick who owns it | Your use agreement decides | Plant, unit, the contractor's report |
| A baggage hall air handler | Conditions the baggage hall | Pick who owns it | Your use agreement decides | Hall, unit, filters, readings found and left |

What the picks put on the record: Asset, Job, Readings.

Your use agreement decides who maintains each unit, and your authority having jurisdiction decides what must be kept.

Bring your gate list and your use agreements. [Book an intro meeting](https://calendly.com/jeel-fieldcamp/30min?utm_source=hvacsoftware.com&utm_medium=markdown&utm_content=airports)

## Before the first bank: what AI takes, and who finishes it

AI takes the routine part. A person decides.

- **4:50 a.m.: Voice agents** — Answer the facilities line when the station manager calls, take the gate, the unit and a [callback number](https://hvacsoftware.com/voice-agents/after-hours-calls/), and open the job on PCA-B14. The agent transfers a live call to a person by the rules you set, or takes the details for a call back. This one is a callback.
- **4:51 a.m.: AI dispatcher** — Proposes who goes to the open job: D. Wickham, free in the window, with one visit that day. A person applies it; nothing is assigned until then.
- **5:52 a.m.: Workflow automation** — [Steps](https://hvacsoftware.com/work-orders/workflows/) run on a status change: when 8212 is Completed, the duty manager is emailed, a follow-up job is created and the technician is texted. A person sets the rule and its steps.
- **5:53 a.m.: AI scheduling** — Proposes a slot for the Thursday recheck of PCA-B14, with who is free and who knows the unit. A person confirms the slot.
- **6:05 a.m.: Chat assistant** — When the duty manager asks which PCA units on Concourse B are out of service or waiting on a recheck, and who maintains them, the answer is read from the records. It reads the records and changes nothing.

## PCA-B14: what its record holds

Whoever opens the unit reads who went, what they found and what was left, and its [monthly service](https://hvacsoftware.com/preventive-maintenance/recurring-visits/) stays on the calendar by date.

PCA-B14: Under the jet bridge at gate B14, serves the gate and its aircraft. Owned and maintained by the airport.

| When | The job | What the record holds |
| --- | --- | --- |
| Four months back | Monthly service | L. Calderon changes filters, checks hoses and reads supply air as found and as left. |
| Three months back | Worn coupling noted | L. Calderon again. The coupling on the cabin hose is noted as worn. |
| Two months back | Contractor visit (Contractor) | Ferrant Air Systems replaces the coupling; its report is attached. |
| Last month | Monthly service again | P. Anand reads the unit and finds nothing outside its limits. |
| Tue · 5:05 | The gate repair | D. Wickham finds supply air and filter pressure outside their limits, fixes the cause and enters both as left. |

## Start with one gate

- **First** — One gate. Load gate B14's units, owner and maintainer, and open the first [work order](https://hvacsoftware.com/work-orders/).
- **Next** — One concourse. Add the air handlers for its holdrooms and their [seasonal service](https://hvacsoftware.com/preventive-maintenance/recurring-visits/).
- **Then** — One plant. Add the chillers and the contractor who services them.

## Questions airport facilities teams ask

### What software do airports use for terminal maintenance, and is this for the airfield or for aircraft?

Airports use airport management software for operations, aircraft maintenance software for fleets and airport facility maintenance software, a CMMS, for terminal buildings and gate units. CMMS stands for computerized maintenance management system, and HVACSoftware.com is one; it is not airfield inspection or aircraft maintenance software.

### What is the difference between the HVAC unit on a jet bridge and a PCA unit?

The HVAC unit on a jet bridge conditions the walkway between the terminal and the aircraft. A PCA unit sends conditioned air into the cabin through a hose, so the aircraft's own auxiliary power unit is used less. Each is its own asset with its own owner, maintainer and visits.

### Who is responsible for maintaining a jet bridge, the airport or the airline?

The use agreement decides, and it can differ from gate to gate. One city's audit found bridges maintained by an airline, others by the airport, and a common-use gate maintained by the airport and paid for per use. Each unit's record carries both.

### Who answers when a gate unit fails before the first departures, and what is captured?

The voice agent answers the facilities line, takes the gate, the unit and a callback number, and opens the job on the unit. A person calls back. By the rules you set, the agent can instead transfer a live call to a person.

### What belongs on a terminal maintenance schedule, and is it set by hours or by date?

Every terminal round is set by calendar date: the monthly PCA unit service, air handlers before summer and winter, chillers before the cooling season, and the ground power check. Your procedure and your authority having jurisdiction set the intervals for airport terminal HVAC maintenance.

### Does it connect to our building automation system, baggage controller or flight schedule?

No connection to a building automation system, a baggage handling controller or a flight schedule is claimed on this page. Bring the systems you run to the first meeting and ask there.

### Can an outside contractor or an airline's crew work in the same record?

Each job names who did the work, airport staff or an outside contractor, and the contractor's report is attached. Whether an airline's own crew can work in the record is a question for the first meeting. City or county airports also see [government buildings](https://hvacsoftware.com/government/), and commercial ones [facilities](https://hvacsoftware.com/facilities/).

### Is an airport CMMS the same as airport management software, and can it replace the system we run?

No: airport management software runs operations such as gates, flights and passengers, while an airport CMMS keeps each unit's maintenance record. HVACSoftware.com is the second kind; what moves across from your current system is a question for the first meeting.

Still have a question? [Book an intro meeting](https://calendly.com/jeel-fieldcamp/30min?utm_source=hvacsoftware.com&utm_medium=markdown&utm_content=airports)

## Bring your gate and plant list

30 minutes about your gates, your plant and the last unit nobody could account for.

[Book an intro meeting](https://calendly.com/jeel-fieldcamp/30min?utm_source=hvacsoftware.com&utm_medium=markdown&utm_content=airports)

---

Also here: [llms.txt](https://hvacsoftware.com/llms.txt)
